Subsea Templates
Project: ABO Client: Breda Energia S. p.a. for Eni Nigeria Year: 2013-2014 Description: Submarine PLEM in deep waters Location: Nigeria Water Depth: 600 m Scopo of work: basic and detailed design of supporting and protective structures for a manifold interconnecting 4 flowlines and of the relavent foundation with suction pile. Construction drawings, piping stress analysis, transportation and installation analyses |